In July 2022, Transconverter in accordance with the concluded Contract with “Novosibirsk Electric Locomotive Building Plant” launched into production the converter PS70-02 YHL4 which is meant for testing drive asynchronous motors which are installed on motor bogies.


In April 2022, Transconverter set about series manufacturing of the input modules TKH01.000.000.00 (slave) and TKH02.000.000.00 (master).


In March 2022, Railway Equipment Registry (FBU RS FZHT) issued declaration №ЕАЭС N RU Д RU.ЖТ02.В.00074/22 on the chokes TK235.810.000.00, TK100.821.000.00, TK80.801.000.00 and TK190.806.000.00.


In January 2022, a commission appointed by the Traction Directorate (a branch of Russian Railways) on the tracks of the TCH-12 St. Petersburg-Finlandsky locomotive depot and on the St. Petersburg-Kuznechnoye section, measured the levels of electromagnetic interference created by the … Continue reading


In November 2021, Transconverter LLC developed and successfully tried the unique bench SI01 YHL4 which is meant for carrying out of acceptance tests of rectifier-inverter unit BVI 4000 2K Y2.


In October 2021, authorized officials of RZD OJSC carried out a technical audit of Transconverter LLC industrial system.


In September 2021, Transconverter LLS specialists participated with a report in the international scientific and technical conference PCIM Asia 2021 (Shanghai, China).


In September 2021, Transconverter LLC manufactured two pulling charging converters ZUT105 01 Y1 for an electric train of an overhead line-battery type EKA 05.


On August 2, 2021 a certification authority of FBU “Railway Equipment Registry” granted a Certificate of conformity №ЕАЭС RU C RU.ЖТ02.В.00875/21 series RU №0326834 to Transconverter for auxiliary converters PSN110 Y1 up to 01.08.2026.


In July 2021 the design office of Transconverter LLC set about developing the test bench SI01 YHL4, which is meant for acceptance tests operation of unit BVI 4000 2K Y2.